top of page
Writer's pictureGRB Human Resources AI

Ensuring Optimal Power Supply Connections for Field Equipment - Mining technology installations




At GRB, we specialize in optimizing the performance and reliability of field equipment through meticulous installation and configuration of power supply cables for switches and radios. Here's a comprehensive guide to ensure seamless operations at your site.

Power Supply Cables: Switch

Within our harness master kits for parcel shelves, each kit includes a switch power cable featuring an M16 connector to a 4-pin female connector. The required pin-out is as follows:


  • Pin 1: Blue (positive)

  • Pin 2: Black (positive)

  • Pin 3: White (negative)

  • Pin 4: Brown (negative)


Upon powering up, indicator lights will display, and a link light on GE-1 will illuminate if the switch is connected to a radio via Ethernet. It's crucial that both the switch and radio are powered through the battery feed, remain operational with the ignition on, stay powered after the ignition is off, and turn off with the battery isolator.

Ports 6 and 7 will only activate after configuration by the CISCO technology team, while Port 8 will light up when a device is connected to the VIMS port and properly configured.

Power Supply Cables: Radio

For radio installations, the harness master kits include a radio power cable with an M12 connector to a 4-pin mini-female connector. After cutting off the mini connector, attach a DT 4-pin female Deutsch connector, following this pin-out:

  • Pin 1: Blue (negative)

  • Pin 2: Black (negative)

  • Pin 3: White (positive)

  • Pin 4: Brown (positive)


Upon powering the radio, an indicator light will display the following:

  • Pink: Initial startup

  • Green: Connected to one peer

  • Blue: Connected to multiple peers


M12 4-way D-coded Pinout

All radios and switches at GRB are connected via the GE-1 port of the switch and the POE IN port of the radio. For dozers, the specific port assignments are:

  • Port 6: G610

  • Port 7: VIMS

  • Port 8: VIMS service port


Pre-made cables are used, but the current stock for dozers has been fully utilized. Below is the M12 connection and RJ45 pin-out:

M12 to RJ45 Pin-Out Configuration:

  • Pin 1: Orange/White

  • Pin 2: Green/White

  • Pin 3: Orange

  • Pin 4: Green

  • Pin 5: Blue/White

  • Pin 6: Green

  • Pin 7: Brown/White

  • Pin 8: Brown


When utilizing only four wires, ensure the 8-way connector pinout is adhered to for optimal functionality.


Conclusion

At GRB, we are committed to supporting our clients with the highest standards of service and technical expertise. By following these detailed guidelines for power supply connections and configurations, we help ensure reliable and efficient operation of your field equipment, maximizing productivity and minimizing downtime. For more information about our services and support, visit our website at GRB.

0 views0 comments

Recent Posts

See All

Comments


bottom of page